Large tree down blocking the way to the long staight away and last little rooty climb. Easily bypassed by making a right towards the creek crossing (and the new bridge) instead of going the normal route left.
Several other low hanging branches or trees squeezing the trail but overall rideable and getting better. Sticks galore all over the trail in some parts.
Trail Leader notified and has a plan to remove it within a day or two.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment